Filter Results

Content type

Topic

Clear all
Clear all

Displaying 481 - 490 results of 805 for:
current work

3.8. Topic 16: The schedule method does not adequately limit heat losses and gains from skylights in large buildings

Proposed amendments to Acceptable Solution H1/AS2 Energy Efficiency for buildings greater than 300m2 to limit the permitted area of skylights in the schedule method to 1.5% of the roof area.