Permitting decision summary: 12 x Global – BlackSky Global LLC (BlackSky)
Published: 31 Jan 2024Variation decision summary for BlackSky Global LLC
Type
File
PDF, 156KB, 1 page
Variation decision summary for BlackSky Global LLC
PDF, 156KB, 1 page
Permitting decision summary for Synspective Inc
PDF, 155KB, 1 page
Permitting decision summary for Spire Global Inc
PDF, 153KB, 1 page
Permitting decision summary for Astroscale Japan Inc
PDF, 159KB, 1 page
Research into the role of sustainability in destination and operator choice.
PDF, 3.6MB, 48 pages
Sustainable Tourism Operators Research - understanding the incentives and barriers to tourism businesses to make sustainable decisions.
PDF, 6MB, 147 pages
The Interim Hydrogen Roadmap outlines the Government’s thinking on the role hydrogen could play in our wider energy transition to net zero by 2050, the actions Government is progressing to support safe and timely uptake and areas signalled for further consideration. A final Roadmap will be published alongside the New Zealand Energy Strategy by the end of 2024. This is an updated version of the Interim Hydrogen Roadmap, issued on 31 January 2024 to amend references to modelling results.
PDF, 3.1MB, 66 pages
A submission to the Electricity Authority on its consultation: Proposed levy-funding appropriation consultation 2024/25
PDF, 304KB, 3 pages
Use this template to understand all the conditions if you are successful with your application.
DOCX, 157KB, 16 pages
The Plan (inclusive of a roadmap) is a blueprint for the future of the tourism data system.
PDF, 578KB, 15 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.