Draft: Annex 2 Remediating Earthquake-Prone Buildings
Published: 1 Jul 2027Annex 2 contains information for engineers on retrofit pathways for different types of EPBs.
Type
File
PDF, 1.5MB, 43 pages
Annex 2 contains information for engineers on retrofit pathways for different types of EPBs.
PDF, 1.5MB, 43 pages
Annex 1 contains detailed technical criteria for engineers on assessing High-Risk Deficiencies (HRDs) in tall buildings made of heavy materials.
PDF, 3MB, 67 pages
The EPB Legislation and Methodology Guidance provides practical guidance, examples and operational information to support territorial authorities, engineers and building owners on the EPB system.
PDF, 3MB, 54 pages
Summary of underpinning analysis for Crown Minerals (Royalties for Petroleum) Amendment Regulations 2026.
PDF, 196KB, 10 pages
Consistency accountability statement for Crown Minerals (Royalties for Petroleum) Amendment Regulations 2026.
PDF, 187KB, 1 page
Report in relation to selected non-departmental appropriations for the year ended 30 June 2026.
PDF, 331KB, 4 pages
Report in relation to selected non-departmental appropriations for the year ended 30 June 2026.
PDF, 885KB, 6 pages
Report in relation to selected non-departmental appropriations for the year ended 30 June 2026.
PDF, 334KB, 4 pages
Report in relation to selected non-departmental appropriations for the year ended 30 June 2026.
PDF, 5.4MB, 17 pages
Permitting decision summary for QPS-SAR-19 and QPS-SAR-20 and Institute for Q-Shu Pioneers of Space
PDF, 344KB, 1 page
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.