Regulatory Impact Statement: Regulating smart EV chargers
Published: 5 May 2026Analysis on requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
File
PDF, 705KB, 33 pages
Analysis on requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 705KB, 33 pages
Cabinet paper seeking agreement to introduce requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 427KB, 3 pages
Briefing for a draft cabinet paper relating to the ACC Turnaround Plan.
PDF, 305KB, 12 pages
This discussion document is to support consultation on the employment dispute system.
PDF, 376KB, 11 pages
Cabinet agreed to requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 286KB, 13 pages
Letter of quality assurance relating to ACC performance targets.
PDF, 11MB, 18 pages
Seeking agreement to not convene a phase assessment meeting under the Fuel Response Plan.
PDF, 228KB, 27 pages
To provide background information and talking points for online meeting with Hon Chris Bowen from 4.00-4.30pm on Monday, 4 May 2026
PDF, 637KB, 9 pages
Providing an overview of jet fuel supply chains in New Zealand and potential options to increase jet fuel reserves.
PDF, 303KB, 2 pages
To provide with a potential policy approach to manage emerging critical goods supply concerns from the ongoing Middle East conflict.
PDF, 1009KB, 24 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.