Regulatory Impact Statement: Regulating smart EV chargers
Published: 5 May 2026Analysis on requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
File
PDF, 705KB, 33 pages
Analysis on requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 705KB, 33 pages
Cabinet paper seeking agreement to introduce requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 427KB, 3 pages
Briefing for a draft cabinet paper relating to the ACC Turnaround Plan.
PDF, 305KB, 12 pages
This discussion document is to support consultation on the employment dispute system.
PDF, 376KB, 11 pages
Cabinet agreed to requirements so EV chargers with a maximum charge rate above 2.4 kW can be supplied in NZ.
PDF, 286KB, 13 pages
Letter of quality assurance relating to ACC performance targets.
PDF, 11MB, 18 pages
Cost-benefit and multicriteria analyses for the proposed self-certification schemes for plumbers and drainlayers and entire residential dwellings and proposals to reduce building inspection wait times.
PDF, 1.7MB, 148 pages
The Jobs Online quarterly report measures changes in online job advertisements from 4 internet job boards.
PDF, 505KB, 16 pages
The template students must use to create and submit their design. This includes space for student details and a parent/caregiver consent section.
PDF, 298KB, 1 page
These outline eligibility, consent requirements, judging, prizes, and how designs may be used.
PDF, 168KB, 4 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.