CTV Building Collapse Investigation - Final Report, Part 3
Published: 25 Jan 2012Part three of the final report into the reasons for the collapse of the CTV Building, including appendices A-K
Type
File
PDF, 17MB, 193 pages
Part three of the final report into the reasons for the collapse of the CTV Building, including appendices A-K
PDF, 17MB, 193 pages
Part one of the final report into the reasons for the collapse of the CTV Building.
PDF, 13MB, 111 pages
Part two of the final report into the reasons for the collapse of the CTV Building.
PDF, 4.7MB, 38 pages
Appendix L of the final report containing structural drawings of the CTV Building and the configuration and condition of structural remnants from the debris.
PDF, 2.5MB, 40 pages
Final report into the technical investigation into the reasons for the collapse of the CTV Building, documenting the configuration and condition of structural remnants that may assist in identifying reasons for the collapse of the building.
PDF, 13MB, 166 pages
Testing methodology and results of testing at the 30-month mark into the efficacy of brush-on remedial treatments treatments on Radiata pine framing.
PDF, 1.2MB, 43 pages
Investigation into why the Pyne Gould Building collapsed during the 22 February 2011 earthquake
PDF, 2.2MB, 51 pages
Investigation into why the stairs in the Forsyth Barr Building in Christchurch collapsed during the 22 February 2011 Earthquake
PDF, 2.2MB, 52 pages
Report on the remedial treatment of difficult to access framing timber comparison of two treatment methods
PDF, 1.4MB, 20 pages
Site examination and materials tests on the Forsyth Barr Building Stairs
PDF, 4.5MB, 51 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.