Summary of overseas seismic mitigation risk programmes
Published: 15 Oct 2025Summary of overseas seismic mitigation risk programmes.
Type
File
PDF, 367KB, 25 pages
Summary of overseas seismic mitigation risk programmes.
PDF, 367KB, 25 pages
Cost benefit analysis results for revised seismic risk mitigation approach for New Zealand's earthquake-prone buildings.
PDF, 4.4MB, 53 pages
Cabinet noted the report back and invited the to report back by mid-2025 seeking final policy decisions on the design of leave system.
PDF, 130KB, 3 pages
Cabinet noted the design and high-level operations of the SI&T funding system.
PDF, 540KB, 4 pages
Cabinet paper reporting back on the outcomes of targeted consultation and noting proposed change to the direction of the Holidays Act reform.
PDF, 156KB, 11 pages
Briefing seeks Minister
PDF, 1.7MB, 14 pages
Advice on an approach to designing new institutional funding mechanisms.
PDF, 1.4MB, 12 pages
Report builds on the matters identified in the first report and takes account of the government's decisions following our initial report.
PDF, 1.4MB, 66 pages
Analysis produced for the purpose of informing final Cabinet decisions and drafting instructions for legislation supporting the Science, Innovation and Technology reforms.
PDF, 2.9MB, 52 pages
Advice on scope of funds to be included in the new pillars-based system, roles and responsibilities for those funds and timeframes for transitioning funds to the new system.
PDF, 2.1MB, 17 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.