Draft: Annex 2 Remediating Earthquake-Prone Buildings
Published: 1 Jul 2027Annex 2 contains information for engineers on retrofit pathways for different types of EPBs.
Type
File
PDF, 1.5MB, 43 pages
Annex 2 contains information for engineers on retrofit pathways for different types of EPBs.
PDF, 1.5MB, 43 pages
Annex 1 contains detailed technical criteria for engineers on assessing High-Risk Deficiencies (HRDs) in tall buildings made of heavy materials.
PDF, 3MB, 67 pages
The EPB Legislation and Methodology Guidance provides practical guidance, examples and operational information to support territorial authorities, engineers and building owners on the EPB system.
PDF, 3MB, 54 pages
Closure report for the Tenancy Bond Project
PDF, 1.6MB, 9 pages
Cabinet paper with attached Order in Council seeking termination of the statutory management of Ararimu Holdings Ltd.
PDF, 999KB, 6 pages
Cabinet agreed to terminate the statutory management of Ararimu Holdings.
PDF, 286KB, 2 pages
Cabinet paper outlining policy decisions and seeking authorisation for submission of the Building (Exempt Small Stand-alone Dwellings) Order 2026 to the Executive Council.
PDF, 399KB, 6 pages
Cabinet minute confirming the decisions of LEG in relation to the Building (Exempt Small Stand-alone Dwellings) Order 2026.
PDF, 297KB, 3 pages
Information on the project and refined costs.
PDF, 1.5MB, 10 pages
A summary of underpinning analysis for the Building (Exempt Small Stand-alone Dwellings) Order 2026.
PDF, 126KB, 9 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.