Filter Results
Content type
Topic
Clear all
Clear all

Displaying 461 - 470 results of 811 for:
current work

Section 3: The basis for setting fees and levies

Proposed fees and levies are set to recover approximately $42 million annually, considering the proposed increase in budget and any forecast deficit.

3. Understanding how well the building consent system is aligned with its intent

The building consent system provides assurance that the performance of a building satisfies the requirements of the Building Code.

2.9. Topic 6: How the areas of roofs, walls and floors should be measured is unclear

Discussion topic on how the areas of roofs, walls and floors should be measured is unclear