Air New Zealand submission on Energy Demand and Generation Scenarios (EDGS) 2023
Published: 16 Aug 2023Energy Demand and Generation Scenarios (EDGS) 2023 submission by Air New Zealand.
File
PDF, 168KB, 2 pages
Energy Demand and Generation Scenarios (EDGS) 2023 submission by Air New Zealand.
PDF, 168KB, 2 pages
Energy Demand and Generation Scenarios (EDGS) 2023 submission by Save our Trains.
PDF, 214KB, 7 pages
Energy Demand and Generation Scenarios (EDGS) 2023 submission by New Zealand Wind Energy Association.
PDF, 228KB, 8 pages
Energy Demand and Generation Scenarios (EDGS) 2023 submission by Transpower.
PDF, 428KB, 24 pages
Energy Demand and Generation Scenarios (EDGS) 2023 submission by Taranaki Offshore Partnerships.
PDF, 218KB, 8 pages
A submission to the Electricity Authority on its consultation: Targeted Reform of Distribution Pricing
PDF, 346KB, 9 pages
This research was commissioned to help better understand the steps that New Zealand’s emissions-intensive, trade-exposed businesses are taking to transition to a low-emissions economy, their view of what their future looks like within the current and proposed settings and what the barriers are (and solutions could be) in this space.
PDF, 436KB, 23 pages
A submission to the Commerce Commission on their consultation:
PDF, 373KB, 3 pages
Cabinet paper seeking to release a discussion document and in principle decisions for proposals to managing feasibility activities for offshore renewable energy developments.
PDF, 263KB, 13 pages
The Interim Hydrogen Roadmap outlines the Government’s thinking on the role hydrogen could play in our wider energy transition to net zero by 2050, the actions Government is progressing to support safe and timely uptake and areas signalled for further consideration. A final Roadmap will be published alongside the New Zealand Energy Strategy by the end of 2024. This version of the Interim Hydrogen Roadmap has been superseded by a reissued version. This was to update references to reflect the reissued Hydrogen Economic Modelling Report. This version is archived as a record of the document that was published during the public consultation period on the Interim Hydrogen Roadmap, which ran from 9 August to 2 November 2023.
PDF, 2.7MB, 66 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.