Quarterly connectivity update: Q2 to 30 June 2020
Published: 1 Sept 2020Read about how connectivity is improving in your region in the latest quarterly connectivity update for the period of 1 April – 30 June 2020.
Type
File
PDF, 8.9MB, 24 pages
Read about how connectivity is improving in your region in the latest quarterly connectivity update for the period of 1 April – 30 June 2020.
PDF, 8.9MB, 24 pages
PDF, 214KB, 5 pages
Dumping investigation: Galvanised Wire from China and Indonesia August 2020 Trade (Anti-dumping and Countervailing Duties) Act 1988 MBIE has reviewed the level and effect of dumping of galvanised wire from China and Indonesia, and has concluded that provisional measures on dumped imports from China are necessary to prevent material injury during the remaining period of investigation.
PDF, 844KB, 79 pages
Blueberries were identified as a growth sector in the related ”Emerging Growth Opportunities” report. Blueberries emerged as a high growth sector for New Zealand that has grown on the back of growing global demand for this small, healthy fruit.
PDF, 2.4MB, 84 pages
Non-alcohalic beverages were identified as growth sectors in previous ”Emerging Growth Opportunities” research. In this report non-alcoholic beverages include juice, water, and soft drinks (and other similar flavoured beverages).
PDF, 6.5MB, 119 pages
This study contributes to the Ministry of Business, Innovation and Employment’s development of the Electricity Demand and Generation Scenarios (EDGS). It does so by providing a forecast of potential utility-scale photovoltaic (PV) solar electricity generation in New Zealand, with accompanying detailed information such as size, location, and cost of each project.
PDF, 3MB, 85 pages
MBIE’s initiation memo for a full review of the anti-dumping duties currently in place on canned peaches from Greece
PDF, 433KB, 19 pages
Application for a full review of the anti-dumping duties currently in place on canned peaches from Greece.
PDF, 1.4MB, 33 pages
Quarterly connectivity update for the period of 1 October – 31 December 2019, featuring information on the Ultra-Fast Broadband programme, Rural Broadband Initiative, and Mobile Blackspot Fund.
PDF, 8.3MB, 25 pages
Quarterly connectivity update for the period of 1 January – 31 March 2020, featuring information on the Ultra-Fast Broadband programme, Rural Broadband Initiative, and Mobile Blackspot Fund.
PDF, 7.2MB, 25 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.