Modelling assumptions for green peaker generation – June 2023
Published: 17 Jun 2024A report detailing WSP’s modelling assumptions for green peakers.
Type
File
PDF, 168KB, 15 pages
A report detailing WSP’s modelling assumptions for green peakers.
PDF, 168KB, 15 pages
A report detailing WSP’s modelling assumptions for fossil peakers.
PDF, 308KB, 7 pages
This paper backgrounds the biofuels market and explains the build-up of cost for a biofuel to fuel green peakers. An addendum to the report assesses a price forecast for Liquified Natural Gas (LNG).
PDF, 791KB, 20 pages
This report presents a literature review and monitoring data stock-take of previous research relating to the hydrology, water quality, and ecology of the Clutha River (Mata-Au) downstream of Roxburgh Dam (referred to as the lower Clutha).
PDF, 765KB, 26 pages
This report provides a cultural assessment of a wider area around Lake Onslow.
PDF, 2.2MB, 59 pages
This landscape assessment is to assess the landscape and visual values of Lake Onslow and surrounding areas which will contribute to a study to look at options to meet New Zealand’s dry year electricity problem and in particular the investigation into a possible pumped hydro scheme at Lake Onslow.
PDF, 5.7MB, 42 pages
Provides some preliminary thoughts on how a “contractual virtual disaggregation” approach developed for application to an Onslow-type pumped storage scheme might be generalised to apply to 3 specific developments being considered as possible components of a “portfolio alternative”.
PDF, 1.6MB, 133 pages
This report addresses how any large scale dry year storage mechanism (NZ Battery) would interact with and affect New Zealand’s current electricity market.
PDF, 2.5MB, 86 pages
Understanding the ‘cost of shortage’ is a key pillar in the investment case for an NZ Battery solution as it helps provide an indication of the economic and financial costs that are avoided should a viable NZ Battery solution be pursued.
PDF, 1.2MB, 44 pages
This report informs the counterfactual scenario (absent a New Zealand battery investment).
PDF, 993KB, 19 pages
Crown copyright © 2025
    https://www.mbie.govt.nz/document-library
    Please note: This content will change over time and can go out of date.