2425-0330 Approval of Cabinet paper Final Decisions on the International Visitor Conservation and To...
Published: 9 Sept 2024Briefing providing the final version of the Cabinet paper following Consultation.
Type
File
PDF, 200KB, 8 pages
Briefing providing the final version of the Cabinet paper following Consultation.
PDF, 200KB, 8 pages
Stage 2 cost recovery impact statement (CRIS) providing an analysis of options to increase the value of the International Visitor Conservation and Tourism Levy (IVL) to address some of the challenges of tourism.
PDF, 155KB, 13 pages
This document is a summary of submissions from the public consultation on the proposed changes to the International Visitor Conservation and Tourism Levy.
PDF, 695KB, 16 pages
Application form to apply for funding from the Electrifying Great Rides Fund
DOCX, 177KB, 6 pages
Cabinet agreed to a four-week consultation on the International Visitor Conservation and Tourism Levy.
PDF, 151KB, 2 pages
Cabinet paper seeking approval to consult on proposed changes to the International Conservation and Tourism Levy.
PDF, 1.7MB, 10 pages
This report outlines the performance and status of the IVL projects in Year 4 of the IVL programme (1 July 2022 to 30 June 2023).
PDF, 1.6MB, 15 pages
Cabinet noted the final report from Tātaki Auckland Unlimited.
PDF, 148KB, 2 pages
Cabinet noted the priorities for the portfolio, and the levers available to manage international visitor capacity and support domestic tourism.
PDF, 131KB, 2 pages
Cabinet noted the work underway on the future of the tourism sector as a consequence of COVID-19 and the Alert Level 4 settings.
PDF, 134KB, 2 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.