Electricity Price Review: Stakeholder update 11 September 2018
Published: 11 Sept 2018Letter presenting the first report for discussion
Type
File
PDF, 383KB, 2 pages
Letter presenting the first report for discussion
PDF, 383KB, 2 pages
This paper is a companion to the review’s first report. It includes a technical discussion on: Pricing analysis comparing wholesale electricity prices against the cost of building new power stations; the financial performance of generators and retailers, and whether they have been making excessive profits; analysis of allocation of distribution costs between businesses and residential consumers; and technological advances in the sector, including case studies on hydrogen fuel cells, large scale batteries, electric vehicle recharging technology, and technology for managing electricity network costs.
PDF, 473KB, 20 pages
At a glance is a 1 page summary of the Electricity Price Review's first report for consultation.
PDF, 95KB, 1 page
This report contains the findings of review panel’s first phase of work, examining the state of New Zealand’s electricity sector. It explores competition and efficiency, reliability, fairness and affordability. It also considers environmental sustainability, the shift to renewable energy, and the impact of innovations on technology. The report was published to stimulate public discussion about the electricity sector during the first phase of the review.
PDF, 1.4MB, 87 pages
Letter from the Chair of the review.
PDF, 289KB, 1 page
This letter expresses the TPM Group's concerns about the Electricity Authority's plans to change the transmission pricing methodology (TPM).
PDF, 395KB, 4 pages
This letter expresses the TPM Group's concerns about the Electricity Authority's plans to change the transmission pricing methodology (TPM).
PDF, 395KB, 4 pages
The Electricity Authority is responsible for the rules on sharing out the $1 billion per year costs of building and running the national transmission grid (the transmission pricing methodology or TPM). This note sets out the Electricity Authority staff's views on regional inequalities under the current TPM.
PDF, 348KB, 2 pages
Guidance on scope, process, and time frames for the 2018-2019 Electricity Price Review..
PDF, 571KB, 4 pages
Letter from the Chair of the review outlining the seven topics likely to form the basis of the discussion paper.
PDF, 399KB, 2 pages
Crown copyright © 2026
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.