Earthquake-prone building policy review terms of reference
Published: 8 May 2012Cabinet paper outlining the terms of reference for the earthquake-prone building policy review
Type
File
PDF, 965KB, 13 pages
Cabinet paper outlining the terms of reference for the earthquake-prone building policy review
PDF, 965KB, 13 pages
Testing methodology and results of testing of the third six-monthly test assessment into the efficacy of brush-on remedial treatments treatments on Radiata pine framing.
PDF, 238KB, 5 pages
Study to evaluate if the brush-on plus injection method previously tested on complex vertical components could be applicable on horizontal components such as lintels.
PDF, 1.1MB, 22 pages
Terms of reference for the earthquake-prone building policy review
PDF, 102KB, 8 pages
Non-leanear seismic analysis report on the CTV Building
PDF, 4.5MB, 154 pages
Details the findings of the investigations into four buildings that failed during the 22 February 2011 aftershock: The CTV Building, Pyne Gould Corporation Building, the Hotel Grand Chancellor Building and the Forsyth Barr Building.
PDF, 10MB, 207 pages
Report setting out the former Department of Building and Housing (now MBIE) response to recommendations on why four multi-storey buildings in the Christchurch CBD failed during the February 2011 aftershock.
PDF, 1.5MB, 52 pages
Part three of the final report into the reasons for the collapse of the CTV Building, including appendices A-K
PDF, 17MB, 193 pages
Part one of the final report into the reasons for the collapse of the CTV Building.
PDF, 13MB, 111 pages
Part two of the final report into the reasons for the collapse of the CTV Building.
PDF, 4.7MB, 38 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.